East Staffordshire skatepark
Client:
Freestyle | East Staffordshire Council
Build:
2007 |
12 weeks
|
550m2
Comments:
Site within Shobnall Leisure Centre
so a strict traffic management plan
implemented to ensure site traffic
didn’t interfere with leisure
facility access. We installed a deep
10-year-storm soakaway system to
drain the facility.
|
|
|
|
|
|
|
|
|
|
|
Harlow skatepark
Client:
Freestyle | Harlow Town Council
Build:
2007 |
14 weeks
|
730m2
Comments:
The site was built on clay so an
above-ground drainage system was
designed. We installed all of the
pathways and ducting for the
lighting and CCTV.
|
|
|
|
|
|
|
|
|
|
|
Albany Park skatepark,
Enfield
Client:
Freestyle | London Borough of Enfield
Build:
2009 |
6 weeks
| 250m2
Comments:
The site was formerly a park
paddling pool situated in Albany. As
we couldn’t get vehicles onto site
we had to set up a pump line daily,
pumping concrete to the site from
the compound 150m away.
|
|
|
|
|
|
|
|