Westbourne Green, Westminster
Client:
Freestyle | London Borough of Westminster
Build:
2008 |
6 weeks
|
250m2
Comments:
Situated underneath The 'Westway' flyover
near central London. Required
careful planning to ensure no
contact with overhead structure by
site plant.
A
planning restriction meant the park
was designed without any contact
with the Westway structure. We also
refurbished the adjacent existing
skatepark. |
|
|
|
|
|
|
|
|
|
|
Cantelowes, Camden
Client:
Wheelscape / Camden Council / Cantelocals skate group
Build:
2007 |
14 weeks
|
1300m2
Comments:
Tiered slab foundations for the
three different bowl levels. Pump
chamber installed for draining
the bowls.
|
|
|
|
|
|
|
|
|
|
|
'Projekts' Phase 2, Manchester
Client:
Freestyle | GB Building Solutions
Build:
2012 |
12 weeks
|
750m2
Comments:
The site imposed a severe height restriction. Strict safety measures were put in place to ensure that no contact was made with the flyover structure above throughout the works.
|
|
|
|
|
|
|
|
|