The Level skate park Brighton
Client:
Freestyle | Brighton City Council
Build:
2013 |
19 weeks
|
1550m2
Comments:
Comprising an intricate mix of plaza and sunken bowls. Midas had to work within a tight
timeframe as the skate park was an
integral component of the £3.2m
redevelopment of The Level, a green space resource in Brighton. The demanding project required the design of a complex drainage system to drain the facility.
|
|
|
|
|
|
|
|
|
|
|
The XC skate park Hemel Hempstead
Client:
Freestyle | Dacorum Sports
Build:
2011 |
13 weeks
|
1300m2
Comments:
The XC ‘Xtreme Connexions’ is the UK's
first indoor concrete park. Working
alongside other contractors, we had
to ensure completion to meet a tight
opening deadline. We installed
pool coping sourced
from the US around the bowl.
|
|
|
|
|
|
|
|
|
|
|
Ealing skatepark
Client:
Freestyle | London Borough of Ealing
Build:
2011 |
15 weeks
|
670m2
Comments:
Site required implementation of a
strict traffic plan. Installed
ducting for lighting and CCTV, plus
access paths. We also installed
outdoor gym equipment and rubber
safety matting.
|
|
|
|
|
|
|
|
|
|